HemingwayPreconstruction Services

Flooring / Tile Estimating

Flooring and tile takeoffs and estimates that measure by finish type, with preparation and transitions carried so material and labor are clear.

Commercial tile or flooring install

Bid more work

Hand off takeoffs and estimates so your team can chase more projects without adding headcount.

See exactly what is in

Every line ties back to a plan or spec reference, with scope assumptions written down.

Reviewed before delivery

Experienced review on every estimate, and direct access to the person who built it.

By finish code

Floors are priced by finish and preparation.

Substrate condition, pattern and transitions change labor and material needs.

  • Resilient, carpet, tile and specialty flooring by finish code
  • Floor preparation, leveling and moisture mitigation
  • Wall tile, bases and accessories
  • Waste factors and pattern layout
  • Transitions, thresholds and edge trim
  • Protection and cleaning
Plans and a hard hat on a table
Estimated remotely from your documents.
What you get

Quantities in the units flooring is bought in.

  • Flooring: square feet or square yards by finish code
  • Tile: square feet by size and pattern
  • Preparation: square feet by condition
  • Bases and trim: linear feet
  • Transitions: count or linear feet
  • Labor: hours by material and pattern
Common catches

Where flooring scope slips.

Often missedWaste factors left generic.
How we catch itWaste set by pattern and layout.
Often missedPreparation not carried.
How we catch itPreparation and moisture requirements stated.
Often missedFinish codes combined.
How we catch itEach code measured separately.
Often missedTransitions overlooked.
How we catch itCounted from finish plans.

Checked by the founder and chief estimator.

Our estimators perform the work, and every estimate is checked by the founder and chief estimator.

Meet our chief estimator
FAQ

Good questions.

Who uses this service?

Flooring contractors, general contractors and homebuilders.

Do you include floor leveling?

Leveling and preparation are included when stated in the documents or requested. We state the assumption in each estimate.

Can I get quantities only?

Yes. A quantity takeoff carries no unit costs. A priced estimate states the pricing basis: your rates, Hemingway pricing inputs for the project's ZIP code, or an applicable wage determination.

What should I send?

Finish plans and schedule, floor plans, details, Division 09 specifications and addenda.

Request a flooring quote

Send the location, scope, documents and due date. We reply with availability and a quote.

Request an Estimate