Schedule of Values (SOV)
A complete SOV built from the drawings, organized by CSI division and ready to carry into a GMP.
- Quantities, unit costs, and subcontract amounts per line
- Cross-checked against specs
- Reconciled at each design milestone
Redacted examples of Hemingway deliverables. Project names, clients, and pricing sources are removed. The level of detail is real. Each card shows a preview, and we send the full redacted file on request.
A complete SOV built from the drawings, organized by CSI division and ready to carry into a GMP.
Alternate systems and assemblies priced against the original design intent, with a clear recommendation on each.
A realistic budget built from a narrative and limited information, before the design is locked.
Bids leveled scope by scope, not just by bottom line, with a recommendation you can defend.
A ProjectDesk bid tracker for subcontractors is in development. See what is planned.
Detailed material quantities in an organized spreadsheet, with the plan reference on every line.
A bid-ready workbook with material pricing, labor hours, and the qualifications and exclusions for your proposal.
Tell us your project type and we will send the closest full sample.