Project identities and clients are kept confidential. What follows reflects sector, scale, and scope of preconstruction work led or managed directly. Additional detail available on request.
Design-build renovation of active ICU units. Managed ICRA containment, infection control coordination, and phasing to deliver a complete GMP in an occupied clinical environment with scope gaps not reflected in the drawings.
Phased renovation of a three-story occupied medical office building. Finalized GMP against incomplete specifications and evaluated five bid phases as a unified pricing strategy.
Conversion of a 32,000 SF retail shell into a full-service ambulatory care facility — imaging, urgent care, lab services. Full structural, MEP, and healthcare-grade systems buildout.
Phased expansion within an active oncology research environment, sequenced around continuous night/weekend shift-based construction.
Series of occupied clinic and outpatient surgery center renovations — neurology, cardiology, GI, general surgery — under ICRA Class IV containment and full AHCA compliance.
Occupied pediatric inpatient, pharmacy, and support-space renovations requiring strict infection control and continuous clinical operations.
New construction of an intermediate care facility for long-term rehabilitation, from conceptual estimate through GMP.
Conversion of a 130,000 SF former hospital into 71-unit affordable housing and mixed-use space. Delivered two competitive bids under significant unknown-conditions risk in a 50-year-old structure.
Preconstruction and estimating across several ground-up apartment communities, ranging from 58 to 264 units.
Negotiated renovation of a ~180-unit occupied senior residence tower.
Seven-unit townhome community on a 3.3-acre site with significant de-mucking and site development cost exposure; developed alternative phasing to manage budget.
Ground-up two-story tilt-wall classroom and administrative facility. Built a detailed bid manual per package, met state preconstruction procurement requirements, and delivered a final estimate within ~5% of executed GMP, resulting in owner savings.
New construction of a storm-hardened, LEED-certified environmental testing laboratory using tilt-wall construction.
New construction combining CMU, slab-on-grade, and pre-engineered metal building components with specialized process plumbing.
MEP and infrastructure renovations for municipal and government-operated facilities.
40-acre mixed-use site with a 15-acre amenity lagoon and multiple support structures. Recovered a distressed preconstruction effort, corrected inherited scope gaps, and re-bid the project within owner budget targets.
Preconstruction across several hospitality projects ranging from 54 to 471 units, including resort renovation and ground-up hotel construction.
Conversion of an existing warehouse to house large-scale robotic manufacturing equipment, with extensive architectural, structural, and MEP modification. Managed two simultaneous budgets across separate funding sources.
Reach out and we'll talk through scope, timeline, and where Hemingway fits into your preconstruction schedule.