Demolition Estimating
Demolition takeoffs and priced estimates that separate selective from full demolition, so your scope and haul-off are clear before you bid.

Bid more work
Hand off takeoffs and estimates so your team can chase more projects without adding headcount.
See exactly what is in
Every line ties back to a plan or spec reference, with scope assumptions written down.
Reviewed before delivery
Experienced review on every estimate, and direct access to the person who built it.
Demolition is won on what stays.
The line between what is removed and what is protected drives labor, disposal and schedule.
- Selective and full demolition by area and level
- Structural, slab and below-grade removals
- Protection of existing finishes and adjacent occupied space
- Hazardous-material abatement shown as included or by others
- Hauling, dumpsters and disposal
- Shoring and temporary support noted where drawings call for it

Quantities in the units demolition is priced in.
- Walls and partitions: square feet by type and height
- Floors and ceilings: square feet by finish and substrate
- Concrete and masonry: cubic yards or square feet by thickness
- MEP removals: by system, with capping and make-safe noted
- Haul-off: loads or tons, with disposal basis stated
- Labor and equipment: hours and equipment by task
Where demolition scope slips.
Checked by the founder and chief estimator.
Our estimators perform the work, and every estimate is checked by the founder and chief estimator.
Good questions.
Who uses this service?
Demolition subcontractors, general contractors pricing renovations and owners planning a phased renovation.
Is abatement included?
Abatement is a licensed specialty. We note it as included or by others in each estimate, based on the survey and your scope.
Can I get quantities only?
Yes. A quantity takeoff carries no unit costs. A priced estimate states the pricing basis: your rates, Hemingway pricing inputs for the project's ZIP code, or an applicable wage determination.
What should I send?
Demolition plans, existing-condition drawings, any hazardous-material survey, the project manual and addenda, and phasing requirements.
Request a demolition quote
Send the location, scope, documents and due date. We reply with availability and a quote.