Site Utilities Estimating

Site utility takeoffs and estimates covering underground water, sewer, storm and service lines, with trenching and connection details counted.

Underground utility pipe in a trench

Bid more work

Hand off takeoffs and estimates so your team can chase more projects without adding headcount.

See exactly what is in

Every line ties back to a plan or spec reference, with scope assumptions written down.

Reviewed before delivery

Experienced review on every estimate, and direct access to the person who built it.

Trench to tie-in

Utilities are priced by run.

Depth, bedding, structures and connection requirements decide the cost of every run.

  • Water, sanitary sewer and storm drainage
  • Manholes, inlets and structures
  • Trenching, bedding and backfill by depth
  • Service connections and tie-ins
  • Testing, disinfection and inspection
  • Dry utility coordination
Plans and a hard hat on a table
Estimated remotely from your documents.
What you get

Quantities in the units utilities are priced in.

  • Pipe: linear feet by size, material and depth
  • Structures: count by type
  • Trenching: cubic yards by depth range
  • Fittings and valves: count by size
  • Connections: count by type
  • Labor and equipment: hours by crew
Common catches

Where site utilities scope slips.

Often missedDepths estimated as averages.
How we catch itDepth measured from profiles.
Often missedStructures grouped.
How we catch itEach structure counted by type and depth.
Often missedDewatering ignored.
How we catch itStated as included, by others or an allowance.
Often missedTie-ins unclear.
How we catch itUtility owner requirements noted.

Checked by the founder and chief estimator.

Our estimators perform the work, and every estimate is checked by the founder and chief estimator.

Meet our chief estimator
FAQ

Good questions.

Who uses this service?

Underground utility contractors, general contractors and developers.

Do you include dry utilities?

Dry utilities are typically by the utility owner. We note coordination and any conduit or trench scope that falls to the contractor.

Can I get quantities only?

Yes. A quantity takeoff carries no unit costs. A priced estimate states the pricing basis: your rates, Hemingway pricing inputs for the project's ZIP code, or an applicable wage determination.

What should I send?

Civil utility plans and profiles, details, geotechnical report if available, Division 33 specifications and addenda.