HemingwayPreconstruction Services

Masonry Estimating

Masonry takeoffs and estimates that cover block, brick, stone, grout and reinforcement, with the details that drive labor shown clearly.

Illustrative photo for masonry estimating

Bid more work

Hand off takeoffs and estimates so your team can chase more projects without adding headcount.

See exactly what is in

Every line ties back to a plan or spec reference, with scope assumptions written down.

Reviewed before delivery

Experienced review on every estimate, and direct access to the person who built it.

Wall by wall

Masonry is priced by assembly.

Wall type, height, reinforcement and scaffolding change cost more than the unit count suggests.

  • CMU, brick and stone veneer by wall type
  • Grout, reinforcing and lintels
  • Insulation, flashing, weeps and control joints
  • Scaffolding and material hoisting
  • Cleaning, sealers and mockups
  • Openings deducted by schedule
Plans and a hard hat on a table
Estimated remotely from your documents.
What you get

Quantities in the units masonry is bought in.

  • Block and brick: square feet or units by type and size
  • Grout and mortar: cubic feet or yards by wall type
  • Reinforcing: bars by size and spacing
  • Accessories: ties, anchors, flashing and joints
  • Scaffolding: by elevation and duration
  • Labor: hours by wall type and height
Common catches

Where masonry scope slips.

Often missedGrouted cells not carried.
How we catch itReinforced and grouted cells measured from wall sections.
Often missedVeneer and backup priced as one.
How we catch itEach wythe measured and priced on its own.
Often missedScaffolding left to labor.
How we catch itScaffolding and hoisting listed as lines.
Often missedLintels and bond beams missed.
How we catch itCounted from the structural and architectural details.

Checked by the founder and chief estimator.

Our estimators perform the work, and every estimate is checked by the founder and chief estimator.

Meet our chief estimator
FAQ

Good questions.

Who uses this service?

Masonry contractors, general contractors pricing envelopes and owners comparing wall systems.

Do you include structural steel lintels?

Steel lintels are often supplied under structural steel. We state who supplies and who sets them in each estimate.

Can I get quantities only?

Yes. A quantity takeoff carries no unit costs. A priced estimate states the pricing basis: your rates, Hemingway pricing inputs for the project's ZIP code, or an applicable wage determination.

What should I send?

Architectural elevations and sections, wall types, structural details, the Division 04 specifications and addenda.

Request a masonry quote

Send the location, scope, documents and due date. We reply with availability and a quote.

Request an Estimate